As I was better almost all previous week I was working in my workshop. I decide to do as much as I could in this time. So there is a lot of progress.

This is frame of new machine, it will be total 1850 x 983 big, and 700 mm high. It should be build like that, because I need someday to take it out of this room. And only 790 mm wide doors are available.



 On next picture frame is upside down. I was installing additional reinforcements. After all nut and screw will be installed I like to glue them with epoxy resin. I the end I will use some epoxy and sand to give it additional weight

In parallel both of my CNC are working. And I am cutting parts for Z axis.
KRESS spindle holder
 Holder for Z ball bearings.

New parts will be ready this week. 